新聞中心
推薦資訊
聯系我們
全國服務熱線:
18765894567
地址:
濟南市市中區經十西路
郵箱:
249058066@qq.com
電話:
18765894567
傳真:
18765894567
技術資訊   當前位置:首頁> 新聞中心 > 技術資訊 > 活動房的九個裝置這些細節要留意
活動房的九個裝置這些細節要留意來源:http://www.king-seng.com   時間:2018-11-06
活動房的九個裝置這些細節要留意
The nine installations of the mobile room should be noted.
修建工地特別是剛開始的時候都是要裝置活動房.有些朋友底子不知道怎么去裝置,也不知道裝置活動房需求留意什么?今日咱們就詳細來了解下
The construction site, especially at the beginning, is to install movable rooms. Some friends do not know how to install movable rooms, nor do they know what to pay attention to? Let's get to know them in detail today.
1.了解圖紙,細心審理活動房平面安置,節點要求,活動房與修建的相關,活動房本身的色澤.填充物.根本尺度要求,在活動房間隔中的門.窗尺度及安置,輔助資料的方式及其它不詳內容.
1. Understand the drawings, carefully examine the layout of the movable room, the requirements of nodes, the relationship between the movable room and the construction, the color and luster of the movable room itself, the filler, the basic scale requirements, the door, window scale and installation in the movable room compartment, the way of supplementary information and other unknown contents.
2.二次排板制圖,這是活動房預制和裝置的重要一步,是把規劃圖紙轉化為可供在工廠第二次加工,把規范規格板制成不同類型的壁板,進行組合以表現規劃目的的中心轉化圖,并在活動房工廠生產出規范板材, 在施工現場組裝,即能夠確保壁板的結實程度又能夠加速活動房的裝置速度.
2. Secondary layout drawing, which is an important step in the prefabrication and installation of movable room, is to convert the planning drawing into the second processing in the factory, make the standard specifications board into different types of wallboard, and combine them to express the planning purpose of the central transformation drawing, and produce the standard plates in the movable room factory, and assemble them in the construction site, that is, to be able to do so. Ensure that the stiffness of the panel can speed up the installation speed of the mobile room.
3.在工廠預制時,依據經歷,門洞.窗洞和縫間充沛考慮到空隙和裝置余量.并在整個運送制造,裝置過程中,避免劃傷.重壓及外表碰擊,以避免呈現無法校正的凹坑和劃痕.活動房兩邊的塑料維護膜,只有在裝置 悉數完畢后,進行完全清潔時才允許揭掉.
3. In factory prefabrication, according to experience, there are plenty of gaps and equipment allowances between doors, windows and seams. During the whole process of transportation and manufacture, scratches, heavy pressure and external collisions are avoided to avoid irreparable pits and scratches. Plastic maintenance film on both sides of the movable room should be cleaned completely only after all the devices have been completed. It is allowed to be undone.
4.活動房裝置前的放線作業,應在地上完成后進行,并在具備裝置的其它相關條件如較大設備已運到位.暗敷地上管線已調整完及技能夾層主要裝置作業根本完成,才能夠進行.放線是在地上上劃出活動房水平 投影及門.窗方位.上下馬槽中心線應在同一筆直面上.
4. The laying-out operation before the installation of the movable room should be completed on the ground, and other relevant conditions with the installation such as the larger equipment has been transported in place. The laying-out operation can only be carried out after the adjustment of pipelines on the ground and the completion of the operation of main installations with skill interlayer. The laying-out is to mark the horizontal projection of the movable room and the orientation of doors and windows on the ground. The centerline should be on the same straight side.
5.裝上下馬槽,下馬槽一般選用帶有內外R角的鋁合金型材.用射釘固定于地上所畫的線上,轉角及終端距邊0.2米為宜,選用止水橡膠條的在射釘之前把兩條膠條放入槽下,在射釘固定后構成防水阻隔關閉.上馬 槽為限制槽鋁,硬吊頂時用射釘固定在頂板上,軟吊頂時選用吊桿懸吊在層面下,高度以吊頂凈高為準.
5. Aluminum alloy profiles with internal and external R angles are generally selected for mounting and lowering manger. Fixed on the line drawn on the ground with shooting nails, the turning angle and the distance between the end and the edge are 0.2 meters. Two rubber strips are put under the trough before shooting nails. After fixing the nails, the water-proof barrier closes. The upper trough is used for limiting trough aluminium, while the hard ceiling is used. The nail is fixed on the roof. When the soft ceiling is suspended, the hanger is suspended at the level, and the height is determined by the ceiling height.
濟南住人集裝箱
6.細立壁板,按排地圖裝入預制好的組件,組件間以固定插件確定相鄰壁板.值得特別留意的是在組立壁板的同時配合好電氣暗敷管線及箱盒.壁板應筆直,立縫要靠緊,縫隙越小越漂亮,立縫均勻.在操作時,細心 整理立縫上的維護膜暫時揭開,而千萬不要揭除.整理槽內雜物及粘結的膠液凝結硬塊,否則用再大的力也很難將立縫調整的均勻.密實.
6. Fine vertical wall panels, packed into prefabricated components according to row maps, and fixed plug-ins to determine adjacent wall panels. It is worth noting that while erecting the wall panels, electrical hidden laying pipes and boxes should be well matched. The wall panels should be straight, the vertical seams should be close, the smaller the seams, the more beautiful the vertical seams are, and the vertical seams are even. In operation, carefully tidy up the maintenance film on the vertical seams temporarily. When uncovering, do not uncover. Finishing groove debris and bonded glue solidify lumps, otherwise it is difficult to adjust the vertical seam evenly and compactly with great force.
7.裝吊頂板:頂板的分量支撐是經過固定在周邊的立板及中心懸吊的T型鋁.長邊縫間經過固定插件固定和加固,短邊經過T型鋁和連板抽芯鉚釘固定.吊平頂力求平整,板縫密實均勻.光潔.無痕.無傷.操作注 意同立壁板.
7. installed ceiling board: the roof is fixed on the supporting component through the vertical plate and center of suspension type T aluminum perimeter. Long side seam between the fixed and fixed plug after reinforcement, the short side by T type aluminum rivets connecting plate and fixed ceiling. To smooth, dense and homogeneous smooth. No seams. Mark. No injury. Operation notice of Tongli panel.
8.活動房包柱.包箱.裝陰陽R角.在凈化區內的柱子用б=50活動房另包起來有利于節省資料和統一陰陽R角均為50.先在門窗洞口裝入不銹鋼的門窗框固定牢靠,裝門留意敞開方向,裝窗玻璃.閉門器應調節 好敞開速度和力氣,一般在關門時前半程速度快,后半程力矩小.速度慢,以減小關門碰擊和噪音.
8. activities of the housing package column box. Loading. Yin and Yang R angle. On the other to save data and unified R angle were 50. Yin and Yang in the windows and doors into stainless steel door and window frame fixation with =50 wrapped by activity room in the purification zone pillars, with the door open to the direction of glazing closers. We should adjust the opening speed and strength, generally at the time of closing The first half speed is fast, the rear half torque is small, and the speed is slow, so as to reduce the closing knock and noise.
9.密封硅膠:在凈化區內,凡是有或許影響潔凈度的下述縫隙,均應涂密封硅膠:活動房之間的拼接縫.R角與壁板.頂板的一切縫隙;空調風管.風口.高效過濾器與壁頂板間的縫隙;電氣穿過壁板頂板的維護 管槽與洞口邊際間的縫隙.
9. sealing silicone: in the purification zone, where the gap may affect the cleanliness, shall be painted with silica gel seal: splicing activity room joints between.R angle and wall. All slot roof air duct.; HEPA filter and wall outlet. The gap between the roof panel through the roof; electrical maintenance gap tube the hole between the groove and the marginal.
綜上所述有濟南鵬凱集裝箱有限公司提供,想了解更多濟南住人集裝箱知識,歡迎關注我們的網站:http://www.king-seng.com謝謝支持!
To sum up a Ji'nan Pan-kai container company, want to know more about Ji'nan live in the container of knowledge, welcome to pay attention to our website: http://www.king-seng.com thank you for your support!
欧美性色大片在线观看,亚洲有码在线观看,久久亚洲精品日本波多野结衣,精品久久久久专区无码中文字幕